D2-9016
Main equipment at underground coal mine working face. Through optimized design, the problem of easy wear of the middle groove plate and shovel plate is solved. The double-layer middle plate structure is adopted to ensure the consistent strength of the tank body and improve the reliability of the equipment. ZMJ could provide 630mm-1400mm width line pan AFC for our client. ZMJ had provided 4m longwall system for Merge mine at south kalimantan, 4.5m longwall system for Qinfa coal mine at south kalimantan.