SINGAPORE
Distributor / Manufacturer’s Representative
Product Photo
Designed with an internal piston and seals, the CP2 cylinder is pressured with an inert gas supply, and then turned around and filled slowly from the opposite end. By letting the gas push against the piston, slowly venting the pre-charge gas, the sample is taken at full line pressure from start to finish. While the cylinder is being emptied, full pressure is being maintained and the gas composition is not being altered as a result of pressure reduction.